Advanced Search
Search

CELEBRITY EDGE - IMO 9812705

Ship
1,2434
FavoriteComment
More
Full Screen
Exfir Data
Download Photo

Photo
details

Photographer:
brunoh [ View profile ]
Captured:
Jan 22, 2018
Added:
Jan 22, 2018
Views:
1,243
Image Resolution:
1,800 x 1,201

Description:

Ship has just been in the water; picture taken about 30 minutes before leaving the dock, to be towed to the outfitting pier.

Vessel
particulars

Current name:
CELEBRITY EDGE
Current flag:
Malta
Home port:
Valletta
Vessel Type:
Passenger (cruise) Ship
Gross tonnage:
130,818 tons
Summer DWT:
13,361 tons
Length:
306 m
Beam:
39.05 m
Draught:
8.4 m

AIS Position
of this ship

Last known position:
36°29’46.79” S, 175°9’48.76” E
Status:
Speed, course (heading):
10.7kts, 50.7° (49°)
Destination:
 - Location:
Rfp
 - Arrival:
22nd Apr 2024 / 00:00:27 UTC
Last update:
about 11 hours ago
Source:
AIS (ShipXplorer)

Photo
Categories

This ship exists in the following categories:

Ship's Deck - 1 photos

Ships under Construction - 86 photos

Ships' Lifeboats and Tenders - 7 photos

Cruise Ships and Liners built 2011-2020 - 106 photos

Photographers
of this ship

(34)

Pedro Amaral

3 photos

brunoh

8 photos

Lyndon Henry

14 photos

shipfriend

1 photos

India

3 photos

Peter M P

3 photos

phil gibbo

1 photos

fabianv

1 photos

Emmanuel.L

8 photos

TARBATNESS

1 photos

P_POUVREAU

1 photos

Jorge Subtil

2 photos

RFelix

1 photos

JohnTinos

2 photos

Bill Jex

1 photos

STRIKE7

1 photos

lesricky

1 photos

CDH

2 photos

Celso Hdez

4 photos

COMMENT THIS PHOTO(4)

Newest First
person
Thank you!
As Canberra97 wrote, I can confirm the main generators were not running; for the transfer from dock to pier, three small generators were loaded on board, to provide some lighting and probably also to power the winches in order to facilitate mooring.

Edit
comment

person
Very nice picture Bruno

Edit
comment

person
The lights that you see are the construction workers lighting rigging, even though some of the wiring may in in place there will no fixtures and the main lighting wil be added during the fitting out period.

This is normal procedure on new builds.

Edit
comment

person
They got the lights on already.

Edit
comment